Specialism 03 of 13
Electrical installations
Your consumer unit (fuse board) is old, you need more sockets, or you have a new house to wire. We install to the design and test every circuit, including the RCDs — safety switches that cut power in a fault. A qualified technician certifies the installation before handover.
Main consumer unit · typical elevation
- 01 Mains supply and incomer
- 02 Main isolator
- 03 30 mA RCDs
- 04 Miniature circuit breakers (MCBs), 10, 16 and 20 A
- 05 Phase busbar comb
- 06 Neutral and earth bars
On this page
Who it’s for
You can commission the electrical work on its own or within a wider project:
- A 1980s house with a consumer unit that has no RCD protection
- A new build to be wired from scratch, to the design
- A renovation with new rooms and more socket outlets
- A pool, gate or pump that needs an outdoor supply
What’s included
Your proposal identifies the electrical work we will carry out:
- Main consumer unit and sub-boards
- 30 mA RCD protection
- Conduit, cabling, socket outlets and switches to the design
- Indoor and outdoor lighting
- Mains connection and energising (switching the installation on)
- Continuity, insulation and RCD testing
- Certification of the installation by a qualified technician
- Supplies for outdoor equipment: pool, gates and pumps
How we work in this specialism
How we apply our method to this specialism, in four steps. Every proposal starts with a site visit or a review of your drawings.
-
Site visit and diagnosis
We inspect your consumer unit, circuits and existing installation.
-
Itemised proposal
We set out boards, circuits, lighting points and sockets room by room, with quantities.
-
Works with testing
We install conduit and cabling to the design, then test continuity, insulation and RCDs.
-
Certification and handover
A qualified technician certifies the installation; we complete the mains connection and energising.
What we deliver
At handover, you receive the tested installation and its records:
- An installation tested for continuity, insulation and RCD operation
- Certification by a qualified technician
- Mains connection and energising
- As-built drawings showing the installed circuits
- Statutory warranty
FAQ
Your questions about this specialism. The specific terms are always in your proposal and written contract.
Can I commission just the electrical work?
Yes. We carry out electrical work on its own in new builds or occupied homes, with testing and certification.
Does my old consumer unit need replacing?
We inspect the existing board. If it has no RCD protection, we propose a replacement with 30 mA RCDs and a breaker for each circuit, as set out in the design.
Will I receive electrical certification?
Yes. After continuity, insulation and RCD testing, a qualified technician issues the certification and the installation is connected to the mains.
Related specialisms
Specialisms often commissioned alongside this one:
-
Telecoms and data networks (ITED)
Data conduit and cabling, installed alongside the electrics.
-
Electronic security and automation
CCTV, alarm and gates wired into the installation.
-
HVAC and energy
Supplies for the air conditioning, heat pump and photovoltaics.
Specialism 03 of 13
Need a new or upgraded electrical installation?
Tell us where your project is and what you have in mind. We visit the site where needed and prepare a written proposal, itemised by section, with inclusions and exclusions; your contract is in writing before work starts.
Site visit and written proposal at no cost. With or without a design.
IMPIC licence no. 116724-PAR · Written contract · Complaints Book